methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Purposedifferent
An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.
Complexitydifferent
LowMediumLow
Timedifferent
15-45 minOngoing5-20 min
Participantsdifferent
1-32-123-20
Formatdifferent
AsyncWorkshop + asyncWorkshop
Outputdifferent
ADR File, Decision Log, RationaleKanban board, WIP policies, Flow metricsEffort Heatmap, Risk Signals, Discussion Targets
Tagsno overlap
ArchitectureRationaleDocumentationGovernance
FlowVisual managementDelivery
EstimationEffortRisk
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.