View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Architecture Decision Record | ![]() Engineering Golden Path | ![]() Operations Root Cause Tree Analysis |
|---|---|---|---|
Purposedifferent | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | When teams need a reliable default path for frequent use, sprawl quickly emerges without any guiding logic. Golden Path bundles the preferred path so good practice becomes easy and deviation becomes deliberate. | For a problem with several suspected causes, the method builds a causal structure instead of a mere list. It makes visible how causes connect and where the strongest points of leverage lie. |
Complexitydifferent | Low | Medium | Medium |
Timedifferent | 15-45 min | 1-3 Tage Setup, laufend | 1-3 h |
Participantsdifferent | 1-3 | 2-8 | 2-8 |
Formatdifferent | Async | Workshop + async | Workshop |
Outputdifferent | ADR File, Decision Log, Rationale | Golden Path Guide, Templates, Quality Checks | Cause Tree, Evidence Notes, Countermeasures |
Tagsno overlap | ArchitectureRationaleDocumentationGovernance | EngineeringProductivityGovernance | Root causeTreeIncidentQuality |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






