View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ABC Analysis | ![]() Operations Theory of Constraints | ![]() Engineering Kanban |
|---|---|---|---|
Purposedifferent | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. |
Complexitydifferent | Low | High | Medium |
Timedifferent | 30-60 min | 2-4 h Analyse, laufend | Ongoing |
Participantsdifferent | 1-5 | 3-12 | 2-12 |
Formatdifferent | Async | Workshop + async | Workshop + async |
Outputdifferent | ABC Classification, Focus Rules, Control List | Constraint Map, Improvement Plan, Flow Metrics | Kanban board, WIP policies, Flow metrics |
Tagsno overlap | PrioritizationOperationsPortfolio | OperationsConstraintsFlowImprovement | FlowVisual managementDelivery |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






