Set one concrete value stream, customer, and desired outcome; observe actual work at gemba.
Waste Analysis
A practical method guide: clarify prerequisites and materials, understand the complete process, and look up outputs, pitfalls, and stop criteria.
Prerequisite
What needs to be finished first
Customer value, observed process, time/motion/inventory data, Muda-Mura-Muri matrix, and action log
Preparation
What needs to be ready before start
Customer value, observed process, time/motion/inventory data, Muda-Mura-Muri matrix, and action log
Frontline team · process/value-stream owner · customer perspective · facilitator · action owners
Set one concrete value stream, customer, and desired outcome; observe actual work at gemba.
60–120 minutes for a bounded value stream; add gemba observation.
Prepare a workspace with Value · Observe · Classify · Prioritise · Test; separate example from live data.
Core question
The one question this method answers
Which work creates customer value, which waste is immediately avoidable, which is currently necessary, and which unevenness or overburden produces it?
Flow
Phases with goal, actions, output and pitfall
The flow is read along its value creation so wasteful activities can be distinguished from the actual contribution. Friction and detours become structural signals rather than individual blame. The analysis provides a basis for reducing effort while protecting quality.
Waste Analysis · working structure
Fictional example
Fictional values show the actual method fields.
| Activity | Evidence | Muda | Mura | Muri | Cause | Test |
|---|---|---|---|---|---|---|
| Unit searchAdd evidence and rationale. | avg 7 min; 94m walk | Type 2 | worse with slot clustering | lifting under time pressure | no presorting | pilot slot cart |
| Safety checkAdd evidence and rationale. | 1.8 min; legally required | Type 1 | stable | none | mandatory control | retain |
1. Evidence
- Unit search
- avg 7 min; 94m walk
- Safety check
- 1.8 min; legally required
2. Muda
- Unit search
- Type 2
- Safety check
- Type 1
3. Mura
- Unit search
- worse with slot clustering
- Safety check
- stable
4. Muri
- Unit search
- lifting under time pressure
- Safety check
- none
5. Cause
- Unit search
- no presorting
- Safety check
- mandatory control
6. Test
- Unit search
- pilot slot cart
- Safety check
- retain
All values are fictional.
- 1
Value
Value criterion

Goal
Value criterion: Define customer, outcome, and conditions under which an activity creates value.
Inputs for this step
- Set one concrete value stream, customer, and desired outcome; observe actual work at gemba.
- Customer value, observed process, time/motion/inventory data, Muda-Mura-Muri matrix, and action log
Actions
- Define customer, outcome, and conditions under which an activity creates value.
Output
Value criterion
Define customer, outcome, and conditions under which an activity creates value.
Quality check
Is value defined by the recipient rather than internal utilisation?
Pitfall
Every internally necessary activity is automatically called value. Test activity against customer outcome, transformation, and first-time-right.
Timing: 15–20 minutes
- 2
Observe
Observed flow

Goal
Observed flow: Capture steps, times, paths, inventory, interruptions, and strain in actual flow.
Inputs for this step
- Value criterion
Actions
- Capture steps, times, paths, inventory, interruptions, and strain in actual flow.
Output
Observed flow
Capture steps, times, paths, inventory, interruptions, and strain in actual flow.
Quality check
Were data gathered directly over several cases?
Pitfall
Workshop memory replaces observation. Walk several cycles with operators and mark gaps.
Timing: 30–45 minutes
- 3
Classify
Waste register

Goal
Waste register: Classify non-value work as Muda type 1 or 2, unevenness as Mura, and overburden as Muri.
Inputs for this step
- Observed flow
Actions
- Classify non-value work as Muda type 1 or 2, unevenness as Mura, and overburden as Muri.
Output
Waste register
Classify non-value work as Muda type 1 or 2, unevenness as Mura, and overburden as Muri.
Quality check
Is every classification evidenced by concrete behaviour and effect?
Pitfall
Eight wastes are checked off without system relation. Examine Muda with Mura and Muri; link cause and consequence.
Timing: 20–30 minutes
- 4
Prioritise
Priority

Goal
Priority: Assess risk, frequency, time, and relationships; choose system cause rather than visible symptom.
Inputs for this step
- Waste register
Actions
- Assess risk, frequency, time, and relationships; choose system cause rather than visible symptom.
Output
Priority
Assess risk, frequency, time, and relationships; choose system cause rather than visible symptom.
Quality check
Does priority address customer effect and system cause?
Pitfall
Largest time item is removed in isolation. Check dependencies, safety, and downstream effect before selection.
Timing: 15–25 minutes
- 5
Test
Improvement test

Goal
Improvement test: Run a small countermeasure with prediction, owner, guardrails, and review.
Inputs for this step
- Priority
Actions
- Run a small countermeasure with prediction, owner, guardrails, and review.
Output
Improvement test
Run a small countermeasure with prediction, owner, guardrails, and review.
Quality check
Does the test reduce waste without new Mura or Muri?
Pitfall
Local saving shifts work or overburden elsewhere. Compare end-to-end measures and strain before and after.
Timing: One or more operating cycles
Artifact
What comes out at the end
Sketch: what the artifact looks like
Waste register with value relation, Muda type 1/2, Mura, Muri, evidence, cause, and prioritised experiment.
Record date, owner, source state, and review date; preserve prior versions.
- Gemba observation sheet
- Muda-Mura-Muri register
- Experiment and effect tracking
waste-analysis-working-template.md
Set subject, evidence, roles, flow, and review.
Waste Analysis: Worksheet
Question
To be confirmed
Desired outcome
To be confirmed
Scope
Complete run Time: 60–120 minutes for a bounded value stream; add gemba observation.
Complete this worksheet on paper or in your own document during the work.
Preparation for this scope
Method setup
- Materials: Customer value, observed process, time/motion/inventory data, Muda-Mura-Muri matrix, and action log
- Roles: Frontline team · process/value-stream owner · customer perspective · facilitator · action owners
- Advance information: Set one concrete value stream, customer, and desired outcome; observe actual work at gemba.
- Overall time needed: 60–120 minutes for a bounded value stream; add gemba observation.
- Setup: Prepare a workspace with Value · Observe · Classify · Prioritise · Test; separate example from live data.
Prepare for the work steps
Value: Value criterion
- Set one concrete value stream, customer, and desired outcome; observe actual work at gemba.
- Customer value, observed process, time/motion/inventory data, Muda-Mura-Muri matrix, and action log
Observe: Observed flow
- Value criterion
Classify: Waste register
- Observed flow
Prioritise: Priority
- Waste register
Test: Improvement test
- Priority
Waste Analysis · working structure
| Activity | Evidence | Muda | Mura | Muri | Cause | Test |
|---|---|---|---|---|---|---|
| Unit search | ||||||
| Safety check |
- Unit search: Add evidence and rationale.
- Safety check: Add evidence and rationale.
The blank worksheet contains prompts only.
Reference · original teaching example
Value: Value criterion
Expected artifact: Value criterion
Define customer, outcome, and conditions under which an activity creates value.
Entry:
...
- Is value defined by the recipient rather than internal utilisation?
Observe: Observed flow
Expected artifact: Observed flow
Capture steps, times, paths, inventory, interruptions, and strain in actual flow.
Entry:
...
- Were data gathered directly over several cases?
Classify: Waste register
Expected artifact: Waste register
Classify non-value work as Muda type 1 or 2, unevenness as Mura, and overburden as Muri.
Entry:
...
- Is every classification evidenced by concrete behaviour and effect?
Prioritise: Priority
Expected artifact: Priority
Assess risk, frequency, time, and relationships; choose system cause rather than visible symptom.
Entry:
...
- Does priority address customer effect and system cause?
Test: Improvement test
Expected artifact: Improvement test
Run a small countermeasure with prediction, owner, guardrails, and review.
Entry:
...
- Does the test reduce waste without new Mura or Muri?
Open questions and next steps
...
Method guide: https://methodatlas.meierhoff-systems.de/en/methods/waste-analysis/run-sheet
Example output
Concrete filled scenario, fictional example
Fictional example for orientation. Counts and timings describe this case and are not universal requirements.
waste-analysis-beispiel.md
Concrete filled scenario, fictional example
Fictional teaching example: Waste Analysis · working structure
| Activity | Evidence | Muda | Mura | Muri | Cause | Test |
|---|---|---|---|---|---|---|
| Unit search | avg 7 min; 94m walk | Type 2 | worse with slot clustering | lifting under time pressure | no presorting | pilot slot cart |
| Safety check | 1.8 min; legally required | Type 1 | stable | none | mandatory control | retain |
Pitfalls
Recognize symptoms and steer against them
Quick overview, the full text is in the matching phase in the flow
- Value criterionEvery internally necessary activity is automatically called value.View in phase
- Observed flowWorkshop memory replaces observation.View in phase
- Waste registerEight wastes are checked off without system relation.View in phase
- PriorityLargest time item is removed in isolation.View in phase
- Improvement testLocal saving shifts work or overburden elsewhere.View in phase
Value criterion
Every internally necessary activity is automatically called value.
Test activity against customer outcome, transformation, and first-time-right.
Observed flow
Workshop memory replaces observation.
Walk several cycles with operators and mark gaps.
Waste register
Eight wastes are checked off without system relation.
Examine Muda with Mura and Muri; link cause and consequence.
Priority
Largest time item is removed in isolation.
Check dependencies, safety, and downstream effect before selection.
Improvement test
Local saving shifts work or overburden elsewhere.
Compare end-to-end measures and strain before and after.
Stop criteria
When to pause, resolve prerequisites, or choose another approach