Plan my session
Plan a concrete work block with agenda, roles, preparation, and a copyable result artifact.
Session: RICE Scoring
The plan translates the method into a concrete facilitated work block. Your inputs flow directly into the session brief and work artifact.
Method session with 2-10. The plan uses the existing method logic and the runsheet.
RunsheetUse the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
The session works directly toward RICE Scores. After the session, the artifact should be shareable, reviewable, or reusable.
- 1
Section 1: Calibrate scales
10 minDefine scale per factor: Reach in absolute users or events per quarter; Impact as multiplier (0.25 minimal / 3 massive); Confidence in %; Effort in person-months. Score one example initiative together for calibration. Hint: If scales remain unclear, participants score in different units. Calibration is mandatory, not optional.
FacilitatorRICE Scores - 2
Section 2: Estimate Reach
10-15 minPer initiative: how many users (or events) does the feature touch per quarter? Use numbers from baseline metrics. If uncertain, use range with mean. Hint: Reach is often overestimated. A feature in Settings does not reach 100% of users. Check funnel data, do not guess.
FacilitatorRanked List - 3
Section 3: Impact and Confidence
10-15 minPer initiative: Impact level (0.25/0.5/1/2/3) on outcome goal. Confidence level (50% speculative / 80% tested / 100% proven). If Confidence <50%, park initiative or validate first. Hint: Impact = 3 only with documented evidence (past data, A/B tests). Inflation devalues the scale.
FacilitatorAssumption Log - 4
Section 4: Effort and score
10-15 minEstimate effort per initiative in person-months (including design, QA, rollout). Score = (Reach x Impact x Confidence) / Effort. Sort in table. Hint: Effort is often underestimated. If team historically needs 1.5x longer than estimated, apply multiplier. Otherwise expensive initiatives move upward wrongly.
FacilitatorRICE Scores - 5
Section 5: Sanity check and sorting
10 minReview top-5 ranked initiatives. Gut check: does order intuitively make sense? If not, revisit estimates. Document assumptions per top initiative. Hint: RICE is tool, not oracle. If top-1 is obviously nonsensical, do not enforce ranking; inspect estimates.
OwnerRanked List - 6
Publish artifact
10 minCheck the artifact for completeness, define location, set version or status, and name review recipients.
OwnerRICE Scores
Session Brief
For invitations, boards, tickets, PR descriptions, or workshop notes.
session-brief.md
Session Brief: RICE Scoring
Goal
Artifact: RICE Scores
Working Question
Which initiative delivers the greatest expected outcome per invested effort, and where is estimation uncertainty so high that the order says little?
Context
Initiative list with descriptions; known reach metrics (active users per month, funnel numbers); historical impact of similar features if available; rough effort range from past projects.
Setup
- Format: Method session
- Duration: 30-60 min
- Mode: Workshop or async
- Participants: One PM or PO as owner; one Engineering Lead for effort estimates; one researcher or analyst for reach data; optionally designer for impact assessment.
- Owner: One PM or PO as owner
- Participation mode: Team round, shared work and alignment
- Outcome logic: Finish artifact
Participation Logic
Use the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
Outcome Logic
The session works directly toward RICE Scores. After the session, the artifact should be shareable, reviewable, or reusable.
Input
Table with columns Initiative, Reach, Impact, Confidence, Effort, RICE score; predefined scales (Impact: 0.25 / 0.5 / 1 / 2 / 3; Confidence: 50%/80%/100%); link to initiative description.
Preparation
Create table. Make definitions per factor visible (Reach = number of users per quarter; Impact = quantitative measure on outcome; Confidence = percentage; Effort = person-months). Align team on Impact and Confidence scales before estimating.
Agenda
-
Section 1: Calibrate scales (10 min) Owner: Facilitator Action: Define scale per factor: Reach in absolute users or events per quarter; Impact as multiplier (0.25 minimal / 3 massive); Confidence in %; Effort in person-months. Score one example initiative together for calibration. Hint: If scales remain unclear, participants score in different units. Calibration is mandatory, not optional. Output: RICE Scores
-
Section 2: Estimate Reach (10-15 min) Owner: Facilitator Action: Per initiative: how many users (or events) does the feature touch per quarter? Use numbers from baseline metrics. If uncertain, use range with mean. Hint: Reach is often overestimated. A feature in Settings does not reach 100% of users. Check funnel data, do not guess. Output: Ranked List
-
Section 3: Impact and Confidence (10-15 min) Owner: Facilitator Action: Per initiative: Impact level (0.25/0.5/1/2/3) on outcome goal. Confidence level (50% speculative / 80% tested / 100% proven). If Confidence <50%, park initiative or validate first. Hint: Impact = 3 only with documented evidence (past data, A/B tests). Inflation devalues the scale. Output: Assumption Log
-
Section 4: Effort and score (10-15 min) Owner: Facilitator Action: Estimate effort per initiative in person-months (including design, QA, rollout). Score = (Reach x Impact x Confidence) / Effort. Sort in table. Hint: Effort is often underestimated. If team historically needs 1.5x longer than estimated, apply multiplier. Otherwise expensive initiatives move upward wrongly. Output: RICE Scores
-
Section 5: Sanity check and sorting (10 min) Owner: Owner Action: Review top-5 ranked initiatives. Gut check: does order intuitively make sense? If not, revisit estimates. Document assumptions per top initiative. Hint: RICE is tool, not oracle. If top-1 is obviously nonsensical, do not enforce ranking; inspect estimates. Output: Ranked List
-
Publish artifact (10 min) Owner: Owner Action: Check the artifact for completeness, define location, set version or status, and name review recipients. Output: RICE Scores
Closeout
- Update result artifact: RICE Scores
- Define location, version, and review recipients.
- Define owner, next step, and review date.
Work artifact
Pre-filled starting point based on the matching template.
work-artifact.md
RICE Scores: RICE Scoring
Working Question
Which initiative delivers the greatest expected outcome per invested effort, and where is estimation uncertainty so high that the order says little?
Context
Initiative list with descriptions; known reach metrics (active users per month, funnel numbers); historical impact of similar features if available; rough effort range from past projects.
Participants
- Owner: One PM or PO as owner
- Participants: One PM or PO as owner; one Engineering Lead for effort estimates; one researcher or analyst for reach data; optionally designer for impact assessment.
Input
Table with columns Initiative, Reach, Impact, Confidence, Effort, RICE score; predefined scales (Impact: 0.25 / 0.5 / 1 / 2 / 3; Confidence: 50%/80%/100%); link to initiative description.
Template
RICE Scoring Working Matrix
| Item | Description | Rating | Evidence | Owner | Next step |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 |
Output artifacts
- RICE Scores:
- Ranked List:
- Assumption Log:
Decision or recommendation
What consequence follows from the matrix?
Completion Check
- RICE Scores is complete enough for review:
- Location:
- Version / status:
- Review by:
- Next step:
Next Step
- Review result
- Mark open questions
- Schedule review or decision
RICE Working Template
View templateCompact working template for RICE with context, input, output artifacts, and next step.spreadsheet
rice-working-template.md
Compact working template for RICE with context, input, output artifacts, and next step.
RICE Scoring Working Matrix
| Item | Description | Rating | Evidence | Owner | Next step |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 |
Output artifacts
- RICE Scores:
- Ranked List:
- Assumption Log:
Decision or recommendation
What consequence follows from the matrix?
- Working question, owner, and target artifact are visible.
- The result fits RICE Scores.
- One version per prioritization round with date. For later estimate correction, edit log on entry. After 3-6 months, retrospective: actual outcome vs estimated Impact, derive calibration learning.
- Open questions are noted as follow-ups.
- The next review or decision point is scheduled.