methodatlas
Session Builder

Plan my session

Plan a concrete work block with agenda, roles, preparation, and a copyable result artifact.

Method session3-4 hWorkshop or asyncAARRR funnel

Session: Pirate Metrics AARRR

The plan translates the method into a concrete facilitated work block. Your inputs flow directly into the session brief and work artifact.

Derived automatically

Method session with 2-8. The plan uses the existing method logic and the runsheet.

Runsheet
Participation logic
Team round, shared work and alignment

Use the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.

Outcome logic
Finish artifact

The session works directly toward AARRR funnel. After the session, the artifact should be shareable, reviewable, or reusable.

  1. 1

    Phase 1: Stage definitions

    30 min

    Define a product-specific meaning for each stage: what counts as Acquisition, Activation, Retention, Referral, Revenue. Run a sample user path. Hint: Activation is often set too early (sign-up) or too late (first purchase). Ask: after which action does the user become significantly more likely to return?

    FacilitatorAARRR funnel
  2. 2

    Phase 2: Metrics and baselines

    45 min

    Define one primary metric and 1-2 secondary metrics per stage. Enter current values from BI. Calculate conversion rates between stages. Hint: If a stage has no metric, either tracking is missing or the stage is irrelevant to the business model. Make both explicit.

    FacilitatorMetric baseline
  3. 3

    Phase 3: Identify bottleneck

    30 min

    Compare conversion rates with benchmarks (industry, own history). Mark stage with highest relative weakness. Form a hypothesis on why it is the bottleneck. Hint: The largest absolute drop is not always the main bottleneck. If 80% drop at Acquisition but the highest value stage is retention, retention can still be the best leverage point.

    FacilitatorExperiment backlog
  4. 4

    Phase 4: Hypotheses and experiments

    45 min

    Create 3-5 hypotheses per bottleneck, prioritized by ICE or RICE. For each top hypothesis draft an experiment (setup, success metric, duration, owner). Hint: Hypotheses must target the identified conversion rate, not improve a different stage. Distinguish clearly what measures success of the experiment.

    FacilitatorAARRR funnel
  5. 5

    Phase 5: Cadence and rollout

    20 min

    Set weekly or bi-weekly AARRR-stage review cadence. Dashboard layout with five tiles plus conversion rates. Name an owner per stage. Hint: Without cadence, the model is filled once and then unused. Create recurring calendar cadence immediately.

    OwnerMetric baseline
  6. 6

    Publish artifact

    10 min

    Check the artifact for completeness, define location, set version or status, and name review recipients.

    OwnerAARRR funnel
Usable artifact

Session Brief

For invitations, boards, tickets, PR descriptions, or workshop notes.

session-brief.md

Session Brief: Pirate Metrics AARRR

Goal

Artifact: AARRR funnel

Working Question

Which metric represents each AARRR stage, where is the largest leverage at the bottleneck, and which experiments address it?

Context

Current data from the last 90 days per stage, if available; definition of activation moment; known drop-off points; cohort reports on retention.

Setup

  • Format: Method session
  • Duration: 3-4 h
  • Mode: Workshop or async
  • Participants: One owner (Head of Growth or Product Lead); one data analyst with product analytics access; one person each from marketing, product, customer success, and sales; scribe.
  • Owner: One owner (Head of Growth or Product Lead)
  • Participation mode: Team round, shared work and alignment
  • Outcome logic: Finish artifact

Participation Logic

Use the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.

Outcome Logic

The session works directly toward AARRR funnel. After the session, the artifact should be shareable, reviewable, or reusable.

Input

Whiteboard or Miro board with five columns (Acquisition, Activation, Retention, Referral, Revenue); stage template with fields for definition, metric, baseline, target, source; tracking schema for the product.

Preparation

Create columns and define AARRR order. Prepare one definition card per stage. Data analyst works in parallel in BI tool and streams values live into the workshop.

Agenda

  1. Phase 1: Stage definitions (30 min) Owner: Facilitator Action: Define a product-specific meaning for each stage: what counts as Acquisition, Activation, Retention, Referral, Revenue. Run a sample user path. Hint: Activation is often set too early (sign-up) or too late (first purchase). Ask: after which action does the user become significantly more likely to return? Output: AARRR funnel

  2. Phase 2: Metrics and baselines (45 min) Owner: Facilitator Action: Define one primary metric and 1-2 secondary metrics per stage. Enter current values from BI. Calculate conversion rates between stages. Hint: If a stage has no metric, either tracking is missing or the stage is irrelevant to the business model. Make both explicit. Output: Metric baseline

  3. Phase 3: Identify bottleneck (30 min) Owner: Facilitator Action: Compare conversion rates with benchmarks (industry, own history). Mark stage with highest relative weakness. Form a hypothesis on why it is the bottleneck. Hint: The largest absolute drop is not always the main bottleneck. If 80% drop at Acquisition but the highest value stage is retention, retention can still be the best leverage point. Output: Experiment backlog

  4. Phase 4: Hypotheses and experiments (45 min) Owner: Facilitator Action: Create 3-5 hypotheses per bottleneck, prioritized by ICE or RICE. For each top hypothesis draft an experiment (setup, success metric, duration, owner). Hint: Hypotheses must target the identified conversion rate, not improve a different stage. Distinguish clearly what measures success of the experiment. Output: AARRR funnel

  5. Phase 5: Cadence and rollout (20 min) Owner: Owner Action: Set weekly or bi-weekly AARRR-stage review cadence. Dashboard layout with five tiles plus conversion rates. Name an owner per stage. Hint: Without cadence, the model is filled once and then unused. Create recurring calendar cadence immediately. Output: Metric baseline

  6. Publish artifact (10 min) Owner: Owner Action: Check the artifact for completeness, define location, set version or status, and name review recipients. Output: AARRR funnel

Closeout

  • Update result artifact: AARRR funnel
  • Define location, version, and review recipients.
  • Define owner, next step, and review date.
Usable artifact

Work artifact

Pre-filled starting point based on the matching template.

work-artifact.md

AARRR funnel: Pirate Metrics AARRR

Working Question

Which metric represents each AARRR stage, where is the largest leverage at the bottleneck, and which experiments address it?

Context

Current data from the last 90 days per stage, if available; definition of activation moment; known drop-off points; cohort reports on retention.

Participants

  • Owner: One owner (Head of Growth or Product Lead)
  • Participants: One owner (Head of Growth or Product Lead); one data analyst with product analytics access; one person each from marketing, product, customer success, and sales; scribe.

Input

Whiteboard or Miro board with five columns (Acquisition, Activation, Retention, Referral, Revenue); stage template with fields for definition, metric, baseline, target, source; tracking schema for the product.

Template

Pirate Metrics AARRR Working Template

Goal

Structures growth across Acquisition, Activation, Retention, Referral, and Revenue.

Context

When and for what do we use this method?

Input

Which data, observations, decisions, or materials are available?

Execution

Short notes along the runsheet.

Output artifacts

  • AARRR Funnel:
  • Metric Baseline:
  • Experiment Backlog:

Assumptions and open questions

  • ...

Decision / Next step

Owner, date, and success signal.

Completion Check

  • AARRR funnel is complete enough for review:
  • Location:
  • Version / status:
  • Review by:
  • Next step:

Next Step

  • Review result
  • Mark open questions
  • Schedule review or decision
Template base

Pirate Metrics AARRR Working Template

View templateCompact working template for Pirate Metrics AARRR with context, input, output artifacts, and next step.
markdown

pirate-metrics-working-template.md

Compact working template for Pirate Metrics AARRR with context, input, output artifacts, and next step.

Pirate Metrics AARRR Working Template

Goal

Structures growth across Acquisition, Activation, Retention, Referral, and Revenue.

Context

When and for what do we use this method?

Input

Which data, observations, decisions, or materials are available?

Execution

Short notes along the runsheet.

Output artifacts

  • AARRR Funnel:
  • Metric Baseline:
  • Experiment Backlog:

Assumptions and open questions

  • ...

Decision / Next step

Owner, date, and success signal.

Ready to use when
  • Working question, owner, and target artifact are visible.
  • The result fits AARRR funnel.
  • Track dashboard configuration as code, for example through Looker LookML. Archive a quarterly snapshot as markdown report. Version stage definition changes and keep change date visible.
  • Open questions are noted as follow-ups.
  • The next review or decision point is scheduled.