Plan my session
Plan a concrete work block with agenda, roles, preparation, and a copyable result artifact.
Session: Hypothesis Prioritization Canvas
The plan translates the method into a concrete facilitated work block. Your inputs flow directly into the session brief and work artifact.
Method session with 3-8. The plan uses the existing method logic and the runsheet.
RunsheetUse the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
The session works directly toward Priorisierungs-Canvas. After the session, the artifact should be shareable, reviewable, or reusable.
- 1
Phase 1: Calibrate scales
10 minReview scale definitions with examples. At least one example per level (for example, "Risk 5: business model at stake without confirmation"). Record consensus. Hint: Without scale calibration, rating falls back to gut feel. If no shared scale definition exists, the team has no baseline for prioritization.
FacilitatorPriorisierungs-Canvas - 2
Phase 2: Rate hypotheses individually
30-40 minAssign three values per hypothesis: risk, evidence, effort. Vote anonymously first, then reach consensus. If disagreement occurs, ask for underlying assumptions, do not enforce consensus. Hint: Max 3 min per hypothesis. If discussion is long, document the assumption and park it for follow-up. Hypothesis evaluation is triage, not deep analysis.
FacilitatorHypothesen-Backlog - 3
Phase 3: Position on canvas
10 minPlace hypotheses on the canvas. Top-right quadrant: high risk, low evidence, low effort. These are top test candidates. Hint: If top-right is empty, hypotheses are either too generic or tests are too large. Re-scope hypotheses or split tests.
FacilitatorPriorisierungs-Canvas - 4
Phase 4: Test backlog and owners
10-20 minSelect the top 3 hypotheses for next tests. Set owner and start date per hypothesis. Document follow-up hypotheses as backlog. Fix pipeline order. Hint: Maximum three parallel tests for small teams. For discovery teams with more than five people, more tests may be possible. Pipeline discipline: do not start everything at once.
OwnerHypothesen-Backlog - 5
Publish artifact
10 minCheck the artifact for completeness, define location, set version or status, and name review recipients.
OwnerPriorisierungs-Canvas
Session Brief
For invitations, boards, tickets, PR descriptions, or workshop notes.
session-brief.md
Session Brief: Hypothesis Prioritization Canvas
Goal
Artifact: Priorisierungs-Canvas
Working Question
Which hypotheses combine high risk, low evidence, and low testing effort, and which of them should be tested in the next iterations?
Context
Hypothesis list distributed 1-2 days before; scale definitions (risk 1-5, evidence 1-5, effort 1-5); existing evidence from analytics, interviews, or prior tests; test tool options with rough effort estimates.
Setup
- Format: Method session
- Duration: 60-90 min
- Mode: Workshop
- Participants: A facilitator who holds scales and moderates consensus; one Product Lead as hypothesis owner; 3-6 participants from Discovery, Engineering, Design, Data; a scribe for ratings.
- Owner: A facilitator who holds scales and moderates consensus
- Participation mode: Team round, shared work and alignment
- Outcome logic: Finish artifact
Participation Logic
Use the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
Outcome Logic
The session works directly toward Priorisierungs-Canvas. After the session, the artifact should be shareable, reviewable, or reusable.
Input
Canvas with three axes (risk, evidence, effort) or a quadrant; hypothesis list as cards; visible scale definitions; pens; timer; voting tool (Miro, FigJam).
Preparation
Canvas with three axes or quadrants. Scale banners on the wall: risk (consequence if hypothesis is wrong), evidence (degree of support), effort (test cost). Keep hypothesis cards ready.
Agenda
-
Phase 1: Calibrate scales (10 min) Owner: Facilitator Action: Review scale definitions with examples. At least one example per level (for example, "Risk 5: business model at stake without confirmation"). Record consensus. Hint: Without scale calibration, rating falls back to gut feel. If no shared scale definition exists, the team has no baseline for prioritization. Output: Priorisierungs-Canvas
-
Phase 2: Rate hypotheses individually (30-40 min) Owner: Facilitator Action: Assign three values per hypothesis: risk, evidence, effort. Vote anonymously first, then reach consensus. If disagreement occurs, ask for underlying assumptions, do not enforce consensus. Hint: Max 3 min per hypothesis. If discussion is long, document the assumption and park it for follow-up. Hypothesis evaluation is triage, not deep analysis. Output: Hypothesen-Backlog
-
Phase 3: Position on canvas (10 min) Owner: Facilitator Action: Place hypotheses on the canvas. Top-right quadrant: high risk, low evidence, low effort. These are top test candidates. Hint: If top-right is empty, hypotheses are either too generic or tests are too large. Re-scope hypotheses or split tests. Output: Priorisierungs-Canvas
-
Phase 4: Test backlog and owners (10-20 min) Owner: Owner Action: Select the top 3 hypotheses for next tests. Set owner and start date per hypothesis. Document follow-up hypotheses as backlog. Fix pipeline order. Hint: Maximum three parallel tests for small teams. For discovery teams with more than five people, more tests may be possible. Pipeline discipline: do not start everything at once. Output: Hypothesen-Backlog
-
Publish artifact (10 min) Owner: Owner Action: Check the artifact for completeness, define location, set version or status, and name review recipients. Output: Priorisierungs-Canvas
Closeout
- Update result artifact: Priorisierungs-Canvas
- Define location, version, and review recipients.
- Define owner, next step, and review date.
Work artifact
Pre-filled starting point based on the matching template.
work-artifact.md
Priorisierungs-Canvas: Hypothesis Prioritization Canvas
Working Question
Which hypotheses combine high risk, low evidence, and low testing effort, and which of them should be tested in the next iterations?
Context
Hypothesis list distributed 1-2 days before; scale definitions (risk 1-5, evidence 1-5, effort 1-5); existing evidence from analytics, interviews, or prior tests; test tool options with rough effort estimates.
Participants
- Owner: A facilitator who holds scales and moderates consensus
- Participants: A facilitator who holds scales and moderates consensus; one Product Lead as hypothesis owner; 3-6 participants from Discovery, Engineering, Design, Data; a scribe for ratings.
Input
Canvas with three axes (risk, evidence, effort) or a quadrant; hypothesis list as cards; visible scale definitions; pens; timer; voting tool (Miro, FigJam).
Template
Hypothesis Prioritization Canvas Canvas
Context
What is this method used for?
Core question
Which question should be answered at the end?
Input
Which data, observations, or materials are available?
Working area
- Area 1:
- Area 2:
- Area 3:
- Relationships / patterns:
Output artifacts
- Prioritization Canvas:
- Hypothesis backlog:
Open questions
- ...
Next step
Owner, date, success signal.
Completion Check
- Priorisierungs-Canvas is complete enough for review:
- Location:
- Version / status:
- Review by:
- Next step:
Next Step
- Review result
- Mark open questions
- Schedule review or decision
Hypothesis Prioritization Canvas Working Template
View templateCompact working template for Hypothesis Prioritization Canvas with context, input, output artifacts, and next step.canvas
hypothesis-prioritization-canvas-working-template.md
Compact working template for Hypothesis Prioritization Canvas with context, input, output artifacts, and next step.
Hypothesis Prioritization Canvas Canvas
Context
What is this method used for?
Core question
Which question should be answered at the end?
Input
Which data, observations, or materials are available?
Working area
- Area 1:
- Area 2:
- Area 3:
- Relationships / patterns:
Output artifacts
- Prioritization Canvas:
- Hypothesis backlog:
Open questions
- ...
Next step
Owner, date, success signal.
- Working question, owner, and target artifact are visible.
- The result fits Priorisierungs-Canvas.
- Snapshot per discovery sprint with date. Track hypotheses with status (Planned, Tested, Validated, Rejected). On status change, add date and test reference. Keep backlog pipeline updated and archive prior versions.
- Open questions are noted as follow-ups.
- The next review or decision point is scheduled.