methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Working Backwards with its method-specific working model.
Product Discovery
Working Backwards
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
When the target state and benefit need to be clear first, it thinks backward from the desired outcome into the product logic. It sharpens vision, objections, and value proposition before elaboration.When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
MediumLowLowMedium
Timedifferent
4-8 h, mehrere Iterationen20-40 min initial, dann laufend45-90 min45-60 min
Participantsdifferent
2-63-152-82-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Future Press Release, FAQ, Vision StatementROAM Board, Owner ListAssumption List, Critical Assumptions, Learning PlanAssumption map, Test backlog, Risk ranking
Tagsno overlap
VisionNarrativeAlignment
RiskAgileTrackingAlignment
AssumptionsRiskDecisionDiscovery
AssumptionsRiskExperimentsValidation
Add more methods