methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Wideband Delphi.
Decision Making
Wideband Delphi
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Trade-off Analysis.
Decision Making
Trade-off Analysis
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
A single opinion rarely holds up for planning when the future is genuinely uncertain. It separates options, evaluation criteria, and open risks. The result is captured as an Estimate Range, Assumption Log, and Expert Consensus Notes.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.With limited resources, quality, speed, cost, and risk almost always compete with each other. Trade-off Analysis makes these tensions explicit and prevents decisions from producing hidden side effects.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
HighHighMediumLow
Timedifferent
1-4 h or multiple rounds90-180 min45-120 min30-90 min
Participantsdifferent
4-12 Experten3-82-82-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Estimate Range, Assumption Log, Expert Consensus NotesCoD Table, Prioritization SequenceTrade-off Matrix, Criteria List, Decision Rationale, Accepted DownsidesConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
EstimationExpertsForecasting
PrioritizationDeliveryEconomicsDecision
TradeoffsDecisionCriteriaOptions
ConstraintsDecisionPlanningOptions
Add more methods