methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of Specification by Example with a method-specific labelled workspace.
Agile
Specification by Example
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.When business rules need to become precise, it ties language, example, and test together. It sorts work by value, risk, and delivery ability. The result is captured as an Example Table and Acceptance Tests.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
LowMediumMediumMedium
Timedifferent
45-120 min1-3 h60-90 min pro FeatureOngoing
Participantsdifferent
2-84-103-62-12
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Waste Map, Prioritized Waste, Improvement BacklogCurrent-state map, Future-state map, Bottleneck listExample Table, Acceptance TestsKanban board, WIP policies, Flow metrics
Tagsno overlap
WasteLeanProcess improvement
LeanFlowWasteDelivery
AgileRequirementsExamplesBehavior-Driven Development
FlowVisual managementDelivery
Add more methods