View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Waste Analysis | ![]() Operations PDCA Cycle | ![]() Operations Standard Work Analysis | ![]() Operations Kaizen Event |
|---|---|---|---|---|
Purposedifferent | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. |
Complexitydifferent | Low | Low | Medium | Medium |
Timedifferent | 45-120 min | 1 h bis mehrere Wochen | 1-3 h | 0.5-5 Tage |
Participantsdifferent | 2-8 | 1-8 | 2-6 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Waste Map, Prioritized Waste, Improvement Backlog | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Standard Work Sheet, Deviation List, Improved Standard, Training Needs | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update |
Tags1 shared | WasteLeanProcess improvement | Continuous improvementLeanExperiments | LeanProcessQuality | LeanContinuous improvementOperations |



