methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
LowHighMediumHigh
Timedifferent
45-120 minHalf dayOngoing2-4 h
Participantsdifferent
2-83-122-123-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Waste Map, Prioritized Waste, Improvement BacklogLeverage Map, Action StrategyKanban board, WIP policies, Flow metricsFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
WasteLeanProcess improvement
Systems thinkingChangeStrategy
FlowVisual managementDelivery
Theory of ConstraintsSystems thinkingChange
Add more methods