View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Waste Analysis | ![]() Engineering Kanban | ![]() Systems Thinking Intervention Mapping | ![]() Systems Thinking Leverage Points |
|---|---|---|---|---|
Purposedifferent | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. |
Complexitydifferent | Low | Medium | High | High |
Timedifferent | 45-120 min | Ongoing | 1-5 Tage | Half day |
Participantsdifferent | 2-8 | 2-12 | 4-12 | 3-12 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Waste Map, Prioritized Waste, Improvement Backlog | Kanban board, WIP policies, Flow metrics | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Leverage Map, Action Strategy |
Tagsno overlap | WasteLeanProcess improvement | FlowVisual managementDelivery | ChangeSystems thinkingCapability | Systems thinkingChangeStrategy |



