methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration of Hooked Model with its method-specific working model.
Growth
Hooked Model
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
LowMediumMediumMedium
Timedifferent
45-120 minMultiple workshops over several weeks1-3 hOngoing
Participantsdifferent
2-82-84-102-12
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Waste Map, Prioritized Waste, Improvement BacklogHooked loop, Trigger map, Reward design, Ethics checkCurrent-state map, Future-state map, Bottleneck listKanban board, WIP policies, Flow metrics
Tagsno overlap
WasteLeanProcess improvement
GrowthBehaviorRetention
LeanFlowWasteDelivery
FlowVisual managementDelivery
Add more methods