methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitydifferent
MediumLowLowLow
Timedifferent
1-3 Tage15-30 min Planung, laufend10-20 min daily15-45 min
Participantsdifferent
1-4111-3
Formatdifferent
Workshop + asyncAsyncAsyncAsync
Outputdifferent
Architecture Views, Cross-view Notes, RationaleBlocked Calendar, Capacity View, Focus PlanDaily Plan, Time Estimates, Review NotesADR File, Decision Log, Rationale
Tagsno overlap
DocumentationStakeholdersArchitecture
PlanningTime managementFocus
PlanningTime managementProductivityOperations
ArchitectureRationaleDocumentationGovernance
Add more methods