methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
MediumLowLowMedium
Timedifferent
1-3 Tage60-90 min30 min Setup, dann laufend45-60 min
Participantsdifferent
1-44-121-3 maintaining, briefing for everyone2-8
Formatdifferent
Workshop + asyncWorkshopAsyncWorkshop + async
Outputdifferent
Architecture Views, Cross-view Notes, RationaleAnnotated Diagram, Prioritized Risk List, Action BacklogRAID Log, Status Report SourceAssumption map, Test backlog, Risk ranking
Tagsno overlap
DocumentationStakeholdersArchitecture
RiskArchitectureWorkshopValidation
RiskTrackingStakeholdersGovernance
AssumptionsRiskExperimentsValidation
Add more methods