methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of a scoring table with four factor columns, a calculator and three ordered initiative cards.
Product Strategy
RICE Scoring
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.When many initiatives compete for the same resources, it brings reach, impact, confidence, and effort into one shared ranking. It makes prioritization economically connectable.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
MediumMediumMediumHigh
Timedifferent
1-3 h60-90 minOngoing90-180 min
Participantsdifferent
4-102-102-123-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Current-state map, Future-state map, Bottleneck listRICE Scores, Ranked List, Assumption LogKanban board, WIP policies, Flow metricsCoD Table, Prioritization Sequence
Tagsno overlap
LeanFlowWasteDelivery
PrioritizationScoringRoadmapTradeoffs
FlowVisual managementDelivery
PrioritizationDeliveryEconomicsDecision
Add more methods