View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Value Stream Mapping | ![]() Operations PDCA Cycle | ![]() Operations DMAIC | ![]() Operations Kaizen Event |
|---|---|---|---|---|
Purposedifferent | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. |
Complexitydifferent | Medium | Low | High | Medium |
Timedifferent | 1-3 h | 1 h bis mehrere Wochen | 2-12 Wochen | 0.5-5 Tage |
Participantsdifferent | 4-10 | 1-8 | 3-10 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Current-state map, Future-state map, Bottleneck list | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update |
Tagsno overlap | LeanFlowWasteDelivery | Continuous improvementLeanExperiments | Continuous improvementQualityProcess improvement | LeanContinuous improvementOperations |



