View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Value Stream Mapping | ![]() Engineering Kanban | ![]() Product Discovery Test Card | ![]() Product Discovery Experiment Canvas |
|---|---|---|---|---|
Purposedifferent | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When experiments become unreadable after the fact, it arranges hypothesis, signal, and learning goal on a single canvas. It separates problem, assumption, solution, and evidence. The result is captured as a Completed Experiment Canvas and a Success Metric. |
Complexitydifferent | Medium | Medium | Low | Low |
Timedifferent | 1-3 h | Ongoing | 20-35 min | 30-60 min |
Participantsdifferent | 4-10 | 2-12 | 1-5 | 1-5 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Current-state map, Future-state map, Bottleneck list | Kanban board, WIP policies, Flow metrics | Test Card with a pre-set threshold | Completed Experiment Canvas, Success Metric |
Tagsno overlap | LeanFlowWasteDelivery | FlowVisual managementDelivery | ExperimentsValidationDiscoveryHypothesis | ExperimentsValidationDiscoveryHypothesis |



