methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Systems Mapping method illustration showing its working structure
Systems Thinking
Systems Mapping
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Systems Mapping arranges elements, relationships, and boundaries so a complex field becomes legible at a glance. The overview stabilizes the overall picture before detail work or steering begins.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
MediumMediumMediumHigh
Timedifferent
1-3 hOngoing1-3 hHalf day
Participantsdifferent
4-102-123-123-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Current-state map, Future-state map, Bottleneck listKanban board, WIP policies, Flow metricsSystem Map, Dependencies, Leverage PointsLeverage Map, Action Strategy
Tagsno overlap
LeanFlowWasteDelivery
FlowVisual managementDelivery
Systems thinkingMappingBoundariesChange
Systems thinkingChangeStrategy
Add more methods