methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of Hooked Model with its method-specific working model.
Growth
Hooked Model
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design.For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
1-3 hMultiple workshops over several weeks45-120 minOngoing
Participantsdifferent
4-102-82-82-12
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listHooked loop, Trigger map, Reward design, Ethics checkWaste Map, Prioritized Waste, Improvement BacklogKanban board, WIP policies, Flow metrics
Tagsno overlap
LeanFlowWasteDelivery
GrowthBehaviorRetention
WasteLeanProcess improvement
FlowVisual managementDelivery
Add more methods