methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumHighHighMedium
Timedifferent
1-3 h2-4 hHalf dayOngoing
Participantsdifferent
4-103-83-122-12
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsLeverage Map, Action StrategyKanban board, WIP policies, Flow metrics
Tagsno overlap
LeanFlowWasteDelivery
Theory of ConstraintsSystems thinkingChange
Systems thinkingChangeStrategy
FlowVisual managementDelivery
Add more methods