methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of a Lean Canvas with nine fields, notes, and one highlighted learning risk.
Product Strategy
Lean Canvas
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When an early product bet still has too many open points, it brings target group, problem, and assumptions into a single view. It condenses the idea so core risks become nameable.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumHighMediumMedium
Timedifferent
1-3 h2-4 h45-90 minOngoing
Participantsdifferent
4-103-81-62-12
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsLean Canvas, Core Assumptions, Experiment BacklogKanban board, WIP policies, Flow metrics
Tagsno overlap
LeanFlowWasteDelivery
Theory of ConstraintsSystems thinkingChange
StartupLeanAssumptionsBusiness model
FlowVisual managementDelivery
Add more methods