View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Value Stream Mapping | ![]() Growth A/B Testing | ![]() Product Discovery Test Card | ![]() Product Discovery Fake Door Test |
|---|---|---|---|---|
Purposedifferent | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | The Test Card turns a critical assumption into a testable claim and specifies in advance which result counts as success. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. |
Complexitydifferent | Medium | High | Low | Medium |
Timedifferent | 1-3 h | 1-4 Wochen | 20-35 min | 1-5 Tage |
Participantsdifferent | 4-10 | 1-6 | 1-5 | Nutzertraffic |
Formatdifferent | Workshop | Async | Workshop + async | Async |
Outputdifferent | Current-state map, Future-state map, Bottleneck list | Experiment results, Decision log, Learning summary | Test Card with a pre-set threshold | Click Data, Interest Signal, Learning Decision |
Tagsno overlap | LeanFlowWasteDelivery | ExperimentsGrowthAnalyticsValidation | ExperimentsValidationDiscoveryHypothesis | ValidationExperimentsDemandDiscovery |



