methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Trade-off Analysis.
Decision Making
Trade-off Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
With limited resources, quality, speed, cost, and risk almost always compete with each other. Trade-off Analysis makes these tensions explicit and prevents decisions from producing hidden side effects.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
MediumLowLowLow
Timedifferent
45-120 min20–45 min30-60 min45-90 min
Participantsdifferent
2-8Small cross-functional group3-102-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Trade-off Matrix, Criteria List, Decision Rationale, Accepted DownsidesRisk list, Mitigation plan, Assumption logRisk Matrix, Top Risk ListAssumption List, Critical Assumptions, Learning Plan
Tags1 shared
TradeoffsDecisionCriteriaOptions
RiskDecisionFailurePlanning
RiskDecisionPrioritizationAssessment
AssumptionsRiskDecisionDiscovery
Add more methods