methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper timeline with three dates, parallel lanes for work, signals and decisions, and labeled links.
Facilitation
Timeline
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When a project, incident, or change process is only remembered in fragments, Timeline brings the sequence back into a readable form. It makes turning points, precursors, and after-effects recognizable over the course of time.When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowMediumLowLow
Timedifferent
30-90 min1-3 h60-90 min15-30 min
Participantsdifferent
2-122-64-102-6
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Timeline, Milestones, Insight NotesStandard Work Sheet, Deviation List, Improved Standard, Training NeedsProblem Cluster, Prioritized Challenge, ExperimentRoot cause notes, Countermeasures
Tagsno overlap
TimelineFacilitationSequence
LeanProcessQuality
FacilitationDecisionProblem solvingWorkshop
Root causeIncidentLeanProblem solving
Add more methods