methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper timeline with three dates, parallel lanes for work, signals and decisions, and labeled links.
Facilitation
Timeline
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
When a project, incident, or change process is only remembered in fragments, Timeline brings the sequence back into a readable form. It makes turning points, precursors, and after-effects recognizable over the course of time.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
LowHighLowLow
Timedifferent
30-90 min2-8 h15-30 min60-90 min
Participantsdifferent
2-122-82-64-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Timeline, Milestones, Insight NotesProblem Analysis, Decision Analysis, Risk PlanRoot cause notes, CountermeasuresProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
TimelineFacilitationSequence
Problem solvingRoot causeDecisionOperations
Root causeIncidentLeanProblem solving
FacilitationDecisionProblem solvingWorkshop
Add more methods