methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper timeline with three dates, parallel lanes for work, signals and decisions, and labeled links.
Facilitation
Timeline
Paper illustration for 1-2-4-All.
Facilitation
1-2-4-All
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
When a project, incident, or change process is only remembered in fragments, Timeline brings the sequence back into a readable form. It makes turning points, precursors, and after-effects recognizable over the course of time.When many people in a group too rarely get to speak, 1-2-4-All distributes thinking time more fairly. The format builds participation step by step and makes quiet or still-unformed thoughts usable faster.For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
LowLowMediumLow
Timedifferent
30-90 min10-20 min30-90 min60-90 min
Participantsdifferent
2-124-100+1-64-10
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Timeline, Milestones, Insight NotesIdea List, Shared Insights, Emergent ThemesDecision Tree, Option Map, Assumption ListProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
TimelineFacilitationSequence
FacilitationInclusionIdeation
DecisionTreeOptions
FacilitationDecisionProblem solvingWorkshop
Add more methods