View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for ALPEN Method
Operations
ALPEN Method
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.
Complexitydifferent
LowMediumMediumLow
Timedifferent
15-30 min Planung, laufend10-30 min je ItemOngoing10-20 min daily
Participantsdifferent
11-82-121
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncAsync
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanThree-Point Estimate, Risk Range, Assumption NotesKanban board, WIP policies, Flow metricsDaily Plan, Time Estimates, Review Notes
Tagsno overlap
PlanningTime managementFocus
EstimationUncertaintyForecasting
FlowVisual managementDelivery
PlanningTime managementProductivityOperations