methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitydifferent
LowLowMediumLow
Timedifferent
15-30 min Planung, laufend30 min Setup, dann laufend1-3 Tage1-2 Tage
Participantsdifferent
11-3 maintaining, briefing for everyone1-41-4
Formatdifferent
AsyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanRAID Log, Status Report SourceArchitecture Views, Cross-view Notes, RationaleArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
PlanningTime managementFocus
RiskTrackingStakeholdersGovernance
DocumentationStakeholdersArchitecture
ArchitectureDocumentationCommunication
Add more methods