methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitysame
LowLowLowLow
Timedifferent
15-30 min Planung, laufend30-90 min1-4 h1-2 Tage
Participantsdifferent
12-81-51-4
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesContext Diagram, Container Diagram, Component DiagramArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
PlanningTime managementFocus
ConstraintsDecisionPlanningOptions
ArchitectureCommunicationVisualization
ArchitectureDocumentationCommunication
Add more methods