methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitysame
LowLowLowLow
Timedifferent
15-30 min Planung, laufend1-4 h1-2 Tage15-45 min
Participantsdifferent
11-51-41-3
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncAsync
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanContext Diagram, Container Diagram, Component DiagramArchitecture Document, Context View, Runtime View, Deployment ViewADR File, Decision Log, Rationale
Tagsno overlap
PlanningTime managementFocus
ArchitectureCommunicationVisualization
ArchitectureDocumentationCommunication
ArchitectureRationaleDocumentationGovernance
Add more methods