methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for Communication Plan
Delivery
Communication Plan
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitydifferent
LowMediumLowLow
Timedifferent
15-30 min Planung, laufend2–4 h review as a planning range; preparation and evaluation additional45-90 min1-2 Tage
Participantsdifferent
1Designers, developers as users, and facilitation2-61-4
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsCommunication Plan, Channel Matrix, Message CadenceArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
PlanningTime managementFocus
ArchitectureEngineeringFeedbackValidationTasks
CommunicationStakeholdersDeliveryPlanning
ArchitectureDocumentationCommunication
Add more methods