methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Goal Question Metric with its method-specific working model.
Engineering
Goal Question Metric
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.Helps clarify technical problems, hypotheses, and next steps in concrete terms. It breaks a technical problem into testable parts. The result is captured as a GQM table and metric briefs.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
LowMediumMediumLow
Timedifferent
15-30 min Planung, laufend1-2 h90-180 min30-60 min
Participantsdifferent
14-123-62-8
Formatdifferent
AsyncWorkshopWorkshopWorkshop
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanAlignment Map, Open Issues, Decision QuestionsGQM Table, Metric ProfilesPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
PlanningTime managementFocus
AlignmentStakeholdersStrategyFacilitation
MetricsMeasurementEngineeringAlignment
StakeholdersFacilitationAlignmentPlanning
Add more methods