methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Architecture Communication Canvas method illustration showing its working structure
Architecture
Architecture Communication Canvas
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.The Architecture Communication Canvas plans architecture communication so the right people receive the right message. The method turns technical complexity into deliberate communication design.
Complexitydifferent
LowLowLowMedium
Timedifferent
15-30 min Planung, laufend15-45 min1-4 h60-120 min
Participantsdifferent
11-31-52-8
Formatdifferent
AsyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanADR File, Decision Log, RationaleContext Diagram, Container Diagram, Component DiagramCommunication Canvas, Stakeholder Messages, Architecture Communication Plan
Tagsno overlap
PlanningTime managementFocus
ArchitectureRationaleDocumentationGovernance
ArchitectureCommunicationVisualization
ArchitectureCommunicationStakeholdersCanvas
Add more methods