methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
MediumLowHighHigh
Timedifferent
10-30 min je Item45-120 min2-4 hHalf day
Participantsdifferent
1-82-83-83-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesWaste Map, Prioritized Waste, Improvement BacklogFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsLeverage Map, Action Strategy
Tagsno overlap
EstimationUncertaintyForecasting
WasteLeanProcess improvement
Theory of ConstraintsSystems thinkingChange
Systems thinkingChangeStrategy
Add more methods