methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
10-30 min je ItemlaufendHalf day2-4 h
Participantsdifferent
1-82-123-123-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesThroughput Data, Flow Forecast, Slicing RulesLeverage Map, Action StrategyFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
EstimationUncertaintyForecasting
EstimationForecastingFlow
Systems thinkingChangeStrategy
Theory of ConstraintsSystems thinkingChange
Add more methods