View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Systems Thinking Leverage Points | ![]() Systems Thinking Future Reality Tree | ![]() Systems Thinking Evaporating Cloud |
|---|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. |
Complexitydifferent | Medium | High | High | Medium |
Timedifferent | 10-30 min je Item | Half day | 2-4 h | 60-120 min |
Participantsdifferent | 1-8 | 3-12 | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | Leverage Map, Action Strategy | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments |
Tagsno overlap | EstimationUncertaintyForecasting | Systems thinkingChangeStrategy | Theory of ConstraintsSystems thinkingChange | Theory of ConstraintsAssumptionsSystems thinking |



