Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for NoEstimates.
Agile
NoEstimates
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
10-30 min je ItemOngoingHalf daylaufend
Participantsdifferent
1-82-123-122-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesKanban board, WIP policies, Flow metricsLeverage Map, Action StrategyThroughput Data, Flow Forecast, Slicing Rules
Tagsno overlap
EstimationUncertaintyForecasting
FlowVisual managementDelivery
Systems thinkingChangeStrategy
EstimationForecastingFlow