methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Ideal Days.
Agile
Ideal Days
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.
Complexitydifferent
MediumLowHighHigh
Timedifferent
10-30 min je Item15-60 min2-4 h1-5 Tage
Participantsdifferent
1-82-93-84-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesIdeal Day Estimates, Assumption Notes, Capacity CaveatsFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsLogic Model, Change Objectives, Intervention Components, Evaluation Plan
Tagsno overlap
EstimationUncertaintyForecasting
EstimationEffortAgile
Theory of ConstraintsSystems thinkingChange
ChangeSystems thinkingCapability
Add more methods