View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Systems Thinking Future Reality Tree | ![]() Facilitation Power Interest Grid | ![]() Facilitation Alignment Mapping |
|---|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable. |
Complexitydifferent | Medium | High | Low | Medium |
Timedifferent | 10-30 min je Item | 2-4 h | 30-60 min | 1-2 h |
Participantsdifferent | 1-8 | 3-8 | 2-8 | 4-12 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Power Interest Grid, Strategy per Stakeholder | Alignment Map, Open Issues, Decision Questions |
Tagsno overlap | EstimationUncertaintyForecasting | Theory of ConstraintsSystems thinkingChange | StakeholdersFacilitationAlignmentPlanning | AlignmentStakeholdersStrategyFacilitation |



