View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Decision Making Force Field Analysis | ![]() Systems Thinking Leverage Points | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | Medium | Low | High | High |
Timedifferent | 10-30 min je Item | 45-90 min | Half day | 2-4 h |
Participantsdifferent | 1-8 | 3-12 | 3-12 | 3-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | Force Field Map, Change Levers, Risk Notes | Leverage Map, Action Strategy | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | EstimationUncertaintyForecasting | ChangeDecisionStrategy | Systems thinkingChangeStrategy | Theory of ConstraintsSystems thinkingChange |



