View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Three-Point Estimation | ![]() Systems Thinking Evaporating Cloud | ![]() Decision Making Wideband Delphi | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|---|
Purposedifferent | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | A single opinion rarely holds up for planning when the future is genuinely uncertain. It separates options, evaluation criteria, and open risks. The result is captured as an Estimate Range, Assumption Log, and Expert Consensus Notes. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | Medium | Medium | High | High |
Timedifferent | 10-30 min je Item | 60-120 min | 1-4 h or multiple rounds | 2-4 h |
Participantsdifferent | 1-8 | 2-8 | 4-12 Experten | 3-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop |
Outputdifferent | Three-Point Estimate, Risk Range, Assumption Notes | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Estimate Range, Assumption Log, Expert Consensus Notes | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | EstimationUncertaintyForecasting | Theory of ConstraintsAssumptionsSystems thinking | EstimationExpertsForecasting | Theory of ConstraintsSystems thinkingChange |



