methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.
Complexitysame
MediumMediumMediumMedium
Timedifferent
10-30 min je Item60-120 minOngoing15-45 min
Participantsdifferent
1-82-82-121-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesConflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsKanban board, WIP policies, Flow metricsPERT Estimate, Expected Value, Risk Notes
Tagsno overlap
EstimationUncertaintyForecasting
Theory of ConstraintsAssumptionsSystems thinking
FlowVisual managementDelivery
EstimationUncertaintyRisk
Add more methods