methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for NoEstimates.
Agile
NoEstimates
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.
Complexitydifferent
MediumHighMediumMedium
Timedifferent
10-30 min je Item90-180 minOngoinglaufend
Participantsdifferent
1-83-82-122-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesCoD Table, Prioritization SequenceKanban board, WIP policies, Flow metricsThroughput Data, Flow Forecast, Slicing Rules
Tagsno overlap
EstimationUncertaintyForecasting
PrioritizationDeliveryEconomicsDecision
FlowVisual managementDelivery
EstimationForecastingFlow
Add more methods