Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of ICE Scoring with its method-specific working model.
Product Strategy
ICE Scoring
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When ideas need sorting quickly, it condenses impact, confidence, and effort into one compact score. It connects customer value, product logic, and decision priorities. The result is captured as an ICE table and top-ideas list.
Complexitydifferent
MediumHighMediumLow
Timedifferent
10-30 min je Item90-180 minOngoing30-60 min
Participantsdifferent
1-83-82-122-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesCoD Table, Prioritization SequenceKanban board, WIP policies, Flow metricsICE Table, Top Idea List
Tagsno overlap
EstimationUncertaintyForecasting
PrioritizationDeliveryEconomicsDecision
FlowVisual managementDelivery
PrioritizationScoringGrowthDecision