methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
A paper-based illustration representing Bounded Context Canvas with its core stages and visible working result.
Domain Modeling
Bounded Context Canvas
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Context Map workspace showing the question, observations, and next decision.
Domain Modeling
Context Map
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When a business context is still loosely outlined, it shapes language, responsibility, and integration space. It clarifies what belongs together and where a boundary needs to hold.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When several contexts need to talk to each other, it makes their relationships and dependencies legible. It helps sort integration pressure and responsibilities across system boundaries.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
10-30 min je Item1-3 h2-4 h1-3 h
Participantsdifferent
1-83-83-82-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesContext Canvas, Glossary, Integration NotesFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsContext Map, Integration Patterns, Boundary Notes
Tagsno overlap
EstimationUncertaintyForecasting
Domain-Driven DesignBoundariesModeling
Theory of ConstraintsSystems thinkingChange
Domain-Driven DesignBoundariesStrategy
Add more methods