methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of Barrier Analysis with its method-specific working model.
Operations
Barrier Analysis
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration of MORT Analysis with its method-specific working model.
Operations
MORT Analysis
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.For a safety-relevant event or a system with high protection requirements, the method examines where controls failed. It exposes both technical and organizational gaps.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
10-30 min je Item2-4 h2-6 hMehrere Tage bis Wochen
Participantsdifferent
1-82-63-82-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesBarrier Inventory, Failure Analysis per Barrier, Action BacklogCurrent Reality Tree, Core Problems, Intervention IdeasMORT Worksheets, Findings per Branch, Corrective Actions, Systemic Recommendations
Tagsno overlap
EstimationUncertaintyForecasting
Root causeSafetyIncident
Systems thinkingRoot causeConstraintsCausality
Root causeSafetySystemicIncident
Add more methods