methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration for NoEstimates.
Agile
NoEstimates
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.
Complexitydifferent
MediumLowMediumLow
Timedifferent
10-30 min je Item1-2 Tagelaufend1-4 h
Participantsdifferent
1-81-42-121-5
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesArchitecture Document, Context View, Runtime View, Deployment ViewThroughput Data, Flow Forecast, Slicing RulesContext Diagram, Container Diagram, Component Diagram
Tagsno overlap
EstimationUncertaintyForecasting
ArchitectureDocumentationCommunication
EstimationForecastingFlow
ArchitectureCommunicationVisualization
Add more methods