methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration for Kaizen Event.
Operations
Kaizen Event
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
10-30 min je Item45-90 min0.5-5 Tage15-30 min
Participantsdifferent
1-82-54-102-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesA3 Report, Action Plan, Root Cause AnalysisKaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateRoot cause notes, Countermeasures
Tagsno overlap
EstimationUncertaintyForecasting
LeanProblem solvingCoachingOperations
LeanContinuous improvementOperations
Root causeIncidentLeanProblem solving
Add more methods